KHO THƯ VIỆN 🔎

Apx_C_Noise_TechReport_Sept_2021

➤  Gửi thông báo lỗi    ⚠️ Báo cáo tài liệu vi phạm

Loại tài liệu:     PDF
Số trang:         55 Trang
Tài liệu:           ✅  ĐÃ ĐƯỢC PHÊ DUYỆT
 











Nội dung chi tiết: Apx_C_Noise_TechReport_Sept_2021

Apx_C_Noise_TechReport_Sept_2021

Appendix cRapidRide Roosevelt Project Supplemental Noise and VibrationTechnical ReportRAPIDRIDE ROOSEVELT PROJECT SUPPLEMENTAL NOISE AND VIBRATION TEC

Apx_C_Noise_TechReport_Sept_2021CHNICAL REPORTPrepared forSeattle Department of TransportationZ\J|\ SeattleLj| p Department of1 Transportation44440EXECUTIVE SUMMARYThis technical rep

ort presents a noise and vibration study for the RapidRide Roosevelt u District Option being proposed by the Seattle Department of Transportation (SDO Apx_C_Noise_TechReport_Sept_2021

T). The RapidRide Roosevelt Project studied in the January 2020 RapidRtde Roosevelt Project Environmental Assessment (‘January 2020 EA‘j has a souther

Apx_C_Noise_TechReport_Sept_2021

n terminus in Downtown Seattle and a proposed northern terminus at NE 67th St near Sound Transit's Roosevelt Light Rail Station. The u District Option

Appendix cRapidRide Roosevelt Project Supplemental Noise and VibrationTechnical ReportRAPIDRIDE ROOSEVELT PROJECT SUPPLEMENTAL NOISE AND VIBRATION TEC

Apx_C_Noise_TechReport_Sept_2021trict Station, and a southern terminus in Downtown Seattle. Between Downtown Seattle and the University Bridge the u District Option is unchanged from

the RapidRide Roosevelt Project as described in the January 2020 EA. The u District Option north of the University Bridge would have different elemen Apx_C_Noise_TechReport_Sept_2021

ts to those studied in the January 2020 EA: as such, the preparation of this supplemental technical report IS necessary to identify any potentially ne

Apx_C_Noise_TechReport_Sept_2021

w noise impacts associated with the u District Option.This technical report examines areas where the u District Option departs from the study area use

Appendix cRapidRide Roosevelt Project Supplemental Noise and VibrationTechnical ReportRAPIDRIDE ROOSEVELT PROJECT SUPPLEMENTAL NOISE AND VIBRATION TEC

Apx_C_Noise_TechReport_Sept_2021 2018) included as Appendix D to the RapidRide Roosevelt Project January 2020 EA (SDOT, 2020).The objective of this technical report is to outline the

assessment and report the results of a noise and vibration assessment for the u District Option study area. As directed by the Federal Transit Admini Apx_C_Noise_TechReport_Sept_2021

stration (FTA), the noise and vibration assessment for the u District Option IS based upon guidance described in the FTA Transit Noise and Vibration I

Apx_C_Noise_TechReport_Sept_2021

mpact Assessment (FTA Manual; 2018). It should be noted that the assessment outlined in the 2018 TR was performed in accordance with the previous vers

Appendix cRapidRide Roosevelt Project Supplemental Noise and VibrationTechnical ReportRAPIDRIDE ROOSEVELT PROJECT SUPPLEMENTAL NOISE AND VIBRATION TEC

Apx_C_Noise_TechReport_Sept_2021in the study area. These predicted sound levels were added to measured existing sound levels and then compared with FTA impact thresholds. It was dete

rmined that none of the receptors within the study area would exceed impact thresholds and are unlikely to be impacted by noise generated by bus opera Apx_C_Noise_TechReport_Sept_2021

tions. Similarly, vibration levels from bus operations were predicted at all vibration sensitive receptors within the u District Option study area and

Apx_C_Noise_TechReport_Sept_2021

then compared with FTA impact thresholds. Again, it was found that none of the receptors would exceed impact threshold and are unlikely to be impacte

Appendix cRapidRide Roosevelt Project Supplemental Noise and VibrationTechnical ReportRAPIDRIDE ROOSEVELT PROJECT SUPPLEMENTAL NOISE AND VIBRATION TEC

Apx_C_Noise_TechReport_Sept_2021 some cases, may have the potential to cause cosmetic building damage to adjacent structures. Noise from construction activities IS predicted to excee

d City of Seattle noise criteria. With mitigation and a construction noise control plan, construction activities are likely to satisfy City of Seattle Apx_C_Noise_TechReport_Sept_2021

criteria. Vibration from roadway paving along NE 43rd st between Roosevelt Way NE and 12th Ave NE and jackhammering at stations and ocs pole location

Apx_C_Noise_TechReport_Sept_2021

s has the potential to cause cosmetic building damage to adjacent structures. With a vibration control plan and the implementation of mitigation measu

Appendix cRapidRide Roosevelt Project Supplemental Noise and VibrationTechnical ReportRAPIDRIDE ROOSEVELT PROJECT SUPPLEMENTAL NOISE AND VIBRATION TEC

Apx_C_Noise_TechReport_Sept_2021nlikely.This page intentionally left blank.TABLE OF CONTENTSExecutive Summary.......................................................................iT

able of Contents............................................................iiiAcronyms and Abbreviations............................................. Apx_C_Noise_TechReport_Sept_2021

...........V1.Project Overview.....................................................1-12.Noise and Vibration Criteria..................................

Apx_C_Noise_TechReport_Sept_2021

.......................2-12.1Noise Impact Criteria.........................................................2-12.1.1Transit Noise Impact Criteria......

Appendix cRapidRide Roosevelt Project Supplemental Noise and VibrationTechnical ReportRAPIDRIDE ROOSEVELT PROJECT SUPPLEMENTAL NOISE AND VIBRATION TEC

Apx_C_Noise_TechReport_Sept_2021...............................................2-42.2.1Transit Vibration Criteria............................................2-42.2.1Construction Vibr

ation Criteria.......................................2-53.Methodology...................................................................3-13.1Study Ar Apx_C_Noise_TechReport_Sept_2021

ea.............................................................3-13.2Existing Noise Conditions..............................................3-13.3Oper

Apx_C_Noise_TechReport_Sept_2021

ational Noise......................................................3-4

Appendix cRapidRide Roosevelt Project Supplemental Noise and VibrationTechnical ReportRAPIDRIDE ROOSEVELT PROJECT SUPPLEMENTAL NOISE AND VIBRATION TEC

Appendix cRapidRide Roosevelt Project Supplemental Noise and VibrationTechnical ReportRAPIDRIDE ROOSEVELT PROJECT SUPPLEMENTAL NOISE AND VIBRATION TEC

Gọi ngay
Chat zalo
Facebook