Environmental Monitoring ReportSpecial Report42767VIE: Greater Mekong Subregion Ben Luc-LongThanh Expressway Project - Tranche 1Report on Corrective A

41414-043-emr-en Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB Review Mission. 17-24 October 2016.Prepared by Da

san Consultants Co.. Ltd. in joint venture with Kunhwa Engineering & Consulting Co.. Ltd and International Consultants and Technocrats Pvt. Ltd for th 41414-043-emr-en

e Vietnam Expressway Corporation, the Ministry of Transport of Vietnam, and the Asian Development Bank.CURRENCY EQUIVALENTS (as of 10 February 2017)VN

41414-043-emr-en

D1.00 = $0.000045 S1.oo = VND22.286NOTEIn this report. "$" refers to US dollars unless otherwise statedThis environmental monitoring report is a docum

Environmental Monitoring ReportSpecial Report42767VIE: Greater Mekong Subregion Ben Luc-LongThanh Expressway Project - Tranche 1Report on Corrective A

41414-043-emr-en minary in nature.In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular ter

ritory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any te 41414-043-emr-en

rritory or area.VIETNAM EXPRESSWAY CORPORATIONAdd: 4lh floor, Mitec building, Lot E2, Cat! Giay New Urban Area, Yen Hoa ward, Cau Giay disc, Hanoi, Vi

41414-043-emr-en

etnam Tel: 84-4-36430285 Fax: 84-4-36430270 Email: duongcaotoc@vnn.vnTo:Mr. Hideaki IwasakiDirector, SETC, ADBDate: December 200,2016Ref.No. +550 A/EC

Environmental Monitoring ReportSpecial Report42767VIE: Greater Mekong Subregion Ben Luc-LongThanh Expressway Project - Tranche 1Report on Corrective A

41414-043-emr-en Ben Luc - Long Thanh Expressway Project - Report onCorrective Actions on Environment and Safety following the MOƯ of APB Review Mission from 17-24 Oct

ober 2016.Dear Sir and Madam,We refer to the MOU of ADB Review Mission from 17-24 October 2016 for GMS Ben Luc - Long Thanh Expressway Project which i 41414-043-emr-en

ncluded a Corrective Action Plan as well as an Rapid Site Inspection Report on environment and safety.VEC would like to submit a grievance redress mec

41414-043-emr-en

hanism (GRM) and reports on the remedy action for environment and safety non-compliance from each civil work package’s contractor for your information

Environmental Monitoring ReportSpecial Report42767VIE: Greater Mekong Subregion Ben Luc-LongThanh Expressway Project - Tranche 1Report on Corrective A

41414-043-emr-en ng the grievance redress mechanism (GRM) and public consultation.Best regards,Zy/ioNi- 2\\/Oku fuo\ HÍCH"^.I^avI^xNguyen The Cuong~~T)eputy General Di

rector 41414-043-emr-en

Environmental Monitoring ReportSpecial Report42767VIE: Greater Mekong Subregion Ben Luc-LongThanh Expressway Project - Tranche 1Report on Corrective A