Northfield Electric Department - 2019 Integrated Resource F.Northfield Electric Department2019 Integrated Resource PlanFiled with the Public Utility C

Northfield-Integrated-Resource-PlanCommissionNorthfield Electric Department - 2019 Integrated Resource PlanI EXECUTIVE SUMMARYIncorporated in 1894. the Northfield Electric Department (N

ED) senes approximately 2.200 customers 111 Northfield. Berlin, and Moretown. Northfield, with just over 6.200 residents. IS located in central Vermon Northfield-Integrated-Resource-Plan

t, ten miles south of the State’s capital. Montpelier. It is home to Norwich University, one of NED'S largest customers and the oldest private militar

Northfield-Integrated-Resource-Plan

y college in the United States. As a small municipal utility NED IS careful to balance maintaining reliability and reasonable cost levels With the nee

Northfield Electric Department - 2019 Integrated Resource F.Northfield Electric Department2019 Integrated Resource PlanFiled with the Public Utility C

Northfield-Integrated-Resource-Planmercial customers. Residential customers make up over 85% of the customer mix while accounting for about a third of NED’S retail kWh sales. Thirteen l

arge commercial customers (about 1%) make up about 50% of retail usage with the remaining retail sales going to small commercial and public authority Northfield-Integrated-Resource-Plan

customersConsistent With regulatory requirements, every 3 years NED IS required to prepare and implement a least cost integrated plan (also called an

Northfield-Integrated-Resource-Plan

Integrated Resource Plan. Or IRPt for provision of energy services to Its Vermont customers. NED’S Integrated Resource Plan (IRP) is intended to meet

Northfield Electric Department - 2019 Integrated Resource F.Northfield Electric Department2019 Integrated Resource PlanFiled with the Public Utility C

Northfield-Integrated-Resource-Planconomic costs, through a strategy combining investments and expenditures on energy supply, transmission and distribution capacity, transmission and di

stribution efficiency, and comprehensive energy efficiency programs.ELECTRICITY DEMANDNED is facing a period of relatively flat demand influenced by s Northfield-Integrated-Resource-Plan

everal competing factors, all of which carry some uncertainty. Continued adoption of solar net metering reduces demand although the pace at which net

Northfield-Integrated-Resource-Plan

metering Will grow in NED’S territory IS uncertain. As various incentives aimed at transitioning from fossil fuels to cleaner electricity are made ava

Northfield Electric Department - 2019 Integrated Resource F.Northfield Electric Department2019 Integrated Resource PlanFiled with the Public Utility C

Northfield-Integrated-Resource-Planf electric vehicles.While no significant change in the demand associated with NED’S largest customers IS currently anticipated, the potential does exi

st. Norwich University' represents about 30% of NED'S retail load with an additional twelve large customers accounting for another 20%. NED monitors t Northfield-Integrated-Resource-Plan

he plans of these large customers in order to anticipate necessary changes to the existing system infrastructure. In the case of a Significant expansi

Northfield-Integrated-Resource-Plan

on by one or more customers detailed engineering studies may be needed to identify necessary system upgrades.ELECTRICITY SUPPLYNED'S current power sup

Northfield Electric Department - 2019 Integrated Resource F.Northfield Electric Department2019 Integrated Resource PlanFiled with the Public Utility C

Northfield-Integrated-Resource-Plang duration, with most contracts carrying a fixed price feature. Designed to meet anticipated demand, as well as acting as a hedge against exposure to

volatile ISO-New England spot prices, the portfolio is heavily weighted toward hydro, solar and other renewable sources.When considering future electr Northfield-Integrated-Resource-Plan

icity demand. NED seeks to supplement its existing resources with market contracts as well as new demand-side and supply resources. NED believes that

Northfield-Integrated-Resource-Plan

in addition to working with financially stable counterparties, it is important for new resource decisions to balance four important characteristics: n

Northfield Electric Department - 2019 Integrated Resource F.Northfield Electric Department2019 Integrated Resource PlanFiled with the Public Utility C

Northfield-Integrated-Resource-Planin terms of delivery at specific times and locations. NED anticipates regional availability of competitively priced renewable resources includingPage

iiNorthfield Electric Department - 2019 Integrated Resource Plansolar, wind, and hydro. In addition to being a factor in meeting future electricity re Northfield-Integrated-Resource-Plan

quirements, this category of resource contributes to meeting Renewal Energy Standard goals. Gas fired generation may have a role to play in the future

Northfield-Integrated-Resource-Plan

portfolio for reliability purposes. As battery storage technology matures and proves economically feasible NED sees potential for storage to play an

Northfield Electric Department - 2019 Integrated Resource F.Northfield Electric Department2019 Integrated Resource PlanFiled with the Public Utility C

Northfield-Integrated-Resource-Plansource acquisition decisions. NED employs an integrated financial model that lakes into account impacts on load and subsequent effects on revenue and

power supply costs, as well effects on investment, financing and operating costs. Use of the integrated model allows for evaluation of uncertainly rel Northfield-Integrated-Resource-Plan

ated to key variables, on the way to identifying anticipated rale impacts over lime. While rale trajectory is the primary metric NED relies on to eval

Northfield-Integrated-Resource-Plan

uate resource decisions on an individual or portfolio basis there are other more subjective factors to consider, including resource diversity or expos

Northfield Electric Department - 2019 Integrated Resource F.Northfield Electric Department2019 Integrated Resource PlanFiled with the Public Utility C

Northfield-Integrated-Resource-Planlan (TRP). The first of these involves the need to cover the roughly 10% of NED’s energy' requirement that is currently' unhedged by long term contrac

ts over the 2020 to 2022 period. Options being evaluated by NED include leaving the position unhedged, purchasing a fixed-price market contract for en Northfield-Integrated-Resource-Plan

ergy, or purchasing a fixed-price contract for hydro energy including RECs. The main factors expected to impact this decision are volatility in gas pr

Northfield-Integrated-Resource-Plan

ices, which are a driver of New England energy prices, and expected pricing for RECs needed to meet NED’s obligations under Vermont’s Renewable Energy

Northfield Electric Department - 2019 Integrated Resource F.Northfield Electric Department2019 Integrated Resource PlanFiled with the Public Utility C

Northfield-Integrated-Resource-Planled termination of current long-term contracts. Similar to the first decision described above, the evaluation of options to replace these resources is

expected to be primarily influenced by energy price and REC price considerations. NED notes that the latter decision, which will nearly coincide with Northfield-Integrated-Resource-Plan

the exphation of the current renewable energy standard, may be subject to uncertaintyarising from changes in RES requirements.Because NED holds entit

Northfield-Integrated-Resource-Plan

lements in capacity- resources that exceed expected requirements based on demand, no capacity related resource decisions are anticipated.RENEWABLE ENE

Northfield Electric Department - 2019 Integrated Resource F.Northfield Electric Department2019 Integrated Resource PlanFiled with the Public Utility C

Northfield-Integrated-Resource-Plan from renewable resources. The RES obligation increases over lime and is Stratified into three categories. Tier 1. HER II and HER ill. NED- s obligati

ons under HER 1 can be satisfied by owning or purchasing RECs from qualifying regional resources. TIER ĨĨ obligations must be satisfied by owning or p Northfield-Integrated-Resource-Plan

urchasing RECs from renewable resources located within Vermont. Satisfaction of NED’s TIER ITT obligation involves energy transformation, or reduction

Northfield-Integrated-Resource-Plan

of fossil fuel use within its territory. 11ER 3 programs can consist of thermal efficiency measures, electrification of rhe transportation sector, an

Northfield Electric Department - 2019 Integrated Resource F.Northfield Electric Department2019 Integrated Resource PlanFiled with the Public Utility C

Northfield-Integrated-Resource-Planof traditional fossil fuel applications such as space heating, water heating, or electric vehicles to electric power. NED receives credits toward Its

HER 111 obligation. More detail regarding NED’s plans Io meet its TIER ĨĨĨ obligation is available in Appendix B to this document.ELECTRICITY TRANSMIS Northfield-Integrated-Resource-Plan

SION AND DISTRIBUTIONPage iiiNorthfield Electric Department - 2019 Integrated Resource PlanNED has a compact sen ice territory as a result of being a

Northfield-Integrated-Resource-Plan

small, municipal-owned electric utility and has benefitted from several major system improvements over the past 15 years, including an upgrade of dist

Northfield Electric Department - 2019 Integrated Resource F.Northfield Electric Department2019 Integrated Resource PlanFiled with the Public Utility C

Northfield-Integrated-Resource-Plan cross-shaped configuration running generally north-south, and east-west from the center of town out of the King Street Substation. Most of the Norwic

h University load is served by the Norwich University Substation located on campus and fed from the King Street Substation. The capacity of the sub-tr Northfield-Integrated-Resource-Plan

ansmission line to the Norwich University Substation is currently more than adequate to supply the NU campus and is currently loaded to less than half

Northfield-Integrated-Resource-Plan

Its capacity.In addition to upgrading and routinely maintaining the system to ensure efficiency and reliability. NED IS looking at the need to modern