KHO THƯ VIỆN 🔎

THUYẾT MINH BPTC ĐƯỜNG ĐÔ THỊ MỘC BÀI, TÂY NINHENGLISH

➤  Gửi thông báo lỗi    ⚠️ Báo cáo tài liệu vi phạm

Loại tài liệu:     WORD
Số trang:         118 Trang
Tài liệu:           ✅  ĐÃ ĐƯỢC PHÊ DUYỆT
 













Nội dung chi tiết: THUYẾT MINH BPTC ĐƯỜNG ĐÔ THỊ MỘC BÀI, TÂY NINHENGLISH

THUYẾT MINH BPTC ĐƯỜNG ĐÔ THỊ MỘC BÀI, TÂY NINHENGLISH

Project: Greater Mekong Subregion (GMS) Corridor Towns Development ProjectBid: Moc Bai Urban Road Sub-projectDESCRIPTION OF TECHNICAL AND CONSTRUCTING

THUYẾT MINH BPTC ĐƯỜNG ĐÔ THỊ MỘC BÀI, TÂY NINHENGLISHG METHODPART I: KNOWLEDGE AND AWARENESS OF THE BIDDER TO THE CONSTRUCTION PROJECT AND SITE.I.GENERAL1.1Information of tender-Name of tender: Construct

ion of Moc Bai Urban Roads.-Name of project: Greater Mekong Sub-region Corridor Towns Development Project in Moc Bai - Tay Ninh.-Employer: Tay Ninh Gr THUYẾT MINH BPTC ĐƯỜNG ĐÔ THỊ MỘC BÀI, TÂY NINHENGLISH

eater Mekong Sub-Region Corridor Town Development Project Management Unit (Tay Ninh PMU).-Location: Loi Thuan Commune, Ben Cau District, Tay Ninh Prov

THUYẾT MINH BPTC ĐƯỜNG ĐÔ THỊ MỘC BÀI, TÂY NINHENGLISH

ince.-The Construction of Moc Bai Urban Roads is approved through Tay Ninh Economic Zones Authority’s Decision No. 140/QĐ-BQLKKT issued on the approva

Project: Greater Mekong Subregion (GMS) Corridor Towns Development ProjectBid: Moc Bai Urban Road Sub-projectDESCRIPTION OF TECHNICAL AND CONSTRUCTING

THUYẾT MINH BPTC ĐƯỜNG ĐÔ THỊ MỘC BÀI, TÂY NINHENGLISHocated in the west of Tay Ninh Province, nearby Cambodia border, 60km from Ho Chi Minh city. Moc Bai Urban located on the urban economic corridor town

, under axes: Trans-Asia railway, highway HCM City -Moc Bai, National road 22, the position facilitate Moc Bai Urban in relation to the national and i THUYẾT MINH BPTC ĐƯỜNG ĐÔ THỊ MỘC BÀI, TÂY NINHENGLISH

nternational on road and railway.The aim of this project is to create a good environment to change through invest budget to the prior urban infrastruc

THUYẾT MINH BPTC ĐƯỜNG ĐÔ THỊ MỘC BÀI, TÂY NINHENGLISH

ture and enhance the holding competence in towns and cities. This is appropriate with developing strategies of the programs and area cooperation strat

Project: Greater Mekong Subregion (GMS) Corridor Towns Development ProjectBid: Moc Bai Urban Road Sub-projectDESCRIPTION OF TECHNICAL AND CONSTRUCTING

THUYẾT MINH BPTC ĐƯỜNG ĐÔ THỊ MỘC BÀI, TÂY NINHENGLISHy Ninh Economic Zones Authority issued Decision No. 140/QĐ-BQLKKT on the approval of construction project: “Greater Mekong Sub-region Corridor Towns D

evelopment Project in Moc Bai - Tay Ninh” dated on July 26, 2012.1.2Scale of Bid:The scale of bid is performed as below:Road Đ.N1A: Starting point at THUYẾT MINH BPTC ĐƯỜNG ĐÔ THỊ MỘC BÀI, TÂY NINHENGLISH

Border Guard Post (Dia Xu Bridge) and the ending point crosses road Đ.D11 (on ĐT786, 100m from Dia Xu Bridge). Length of the road L=3.03km.Road Đ.N1B:

THUYẾT MINH BPTC ĐƯỜNG ĐÔ THỊ MỘC BÀI, TÂY NINHENGLISH

Starting point at the end of Dll, 100m heading to Trans-Asia Highway from Dia Xu Bridge, the ending point is about 200m from the intersection with ro

Project: Greater Mekong Subregion (GMS) Corridor Towns Development ProjectBid: Moc Bai Urban Road Sub-projectDESCRIPTION OF TECHNICAL AND CONSTRUCTING

THUYẾT MINH BPTC ĐƯỜNG ĐÔ THỊ MỘC BÀI, TÂY NINHENGLISHĐ.N1. Length of the road L=2.27kmRoad Đ.D11: Starting point at the centre of Đ.N25 (old name 75A) at Kml+758.02, the ending point is at right angles t

o Road Đ.N3 and the horizontal curve to road Đ.D11. Length of road L=1.31km.Project: Greater Mekong Subregion (GMS) Corridor Towns Development Project THUYẾT MINH BPTC ĐƯỜNG ĐÔ THỊ MỘC BÀI, TÂY NINHENGLISH

Bid: Moc Bai Urban Road Sub-projectRoad 51: Starting point at the intersection with ĐD.7 (old name: road 28) and the ending point at the intersection

THUYẾT MINH BPTC ĐƯỜNG ĐÔ THỊ MỘC BÀI, TÂY NINHENGLISH

with ĐD.23 of Moc Bai urban area. Length of road L=2.94km.Size of roadsNo.Name of roadLength of roadWidth of road (m)(km)Left sidewalkCarriagewayRight

Project: Greater Mekong Subregion (GMS) Corridor Towns Development ProjectBid: Moc Bai Urban Road Sub-projectDESCRIPTION OF TECHNICAL AND CONSTRUCTING

THUYẾT MINH BPTC ĐƯỜNG ĐÔ THỊ MỘC BÀI, TÂY NINHENGLISH: (*) length of the road is adjusted as the actual size.II.CONSTRUCTION SPECIFICATION2.1.Road:Roadbed : supplement soil with compatible density ratio

K>0.95. The thickness of the base is 30cm (or 50cm) K>0.98Pavement structure : Pavement structure grade Al, demanding minimum tire pressure of pavemen THUYẾT MINH BPTC ĐƯỜNG ĐÔ THỊ MỘC BÀI, TÂY NINHENGLISH

t £173 MPaAsphalt concrete C12.5 thickness: 5cm

Project: Greater Mekong Subregion (GMS) Corridor Towns Development ProjectBid: Moc Bai Urban Road Sub-projectDESCRIPTION OF TECHNICAL AND CONSTRUCTING

Project: Greater Mekong Subregion (GMS) Corridor Towns Development ProjectBid: Moc Bai Urban Road Sub-projectDESCRIPTION OF TECHNICAL AND CONSTRUCTING

Gọi ngay
Chat zalo
Facebook