KHO THƯ VIỆN 🔎

ĐỘNG CƠ 2NR FE FULL TIẾNG ANH

➤  Gửi thông báo lỗi    ⚠️ Báo cáo tài liệu vi phạm

Loại tài liệu:     PDF
Số trang:         73 Trang
Tài liệu:           ✅  ĐÃ ĐƯỢC PHÊ DUYỆT
 













Nội dung chi tiết: ĐỘNG CƠ 2NR FE FULL TIẾNG ANH

ĐỘNG CƠ 2NR FE FULL TIẾNG ANH

Sequence IVBEngine Assembly Manual42790Section 1New Engine PreparationToyota Engine Assembly ManualNew Engine PreparationSheet 1IVB Draft42736New Engi

ĐỘNG CƠ 2NR FE FULL TIẾNG ANH ine Disassembly ProcedureThe new Toyota 2NR-FE engine is delivered as a long block assembly. If the engine is equipped with a flywheel assembly, remov

e the flywheel. Install the engine on a suitable engine stand in the engine build area.Figure 2Refer to Figure 1:1.Drain engine oil by removing the oi ĐỘNG CƠ 2NR FE FULL TIẾNG ANH

l drain plug with a 14 mm socket wrench.2.Remove oil filter (A).3.Disconnect the positive crankcase valve (PCV) hose (B) from the valve cover and inta

ĐỘNG CƠ 2NR FE FULL TIẾNG ANH

ke manifold connections, and remove.4.Using a 10 mm socket wrench, remove three (3) bolts on the stock throttle body (C), and remove.5.Using an adjust

Sequence IVBEngine Assembly Manual42790Section 1New Engine PreparationToyota Engine Assembly ManualNew Engine PreparationSheet 1IVB Draft42736New Engi

ĐỘNG CƠ 2NR FE FULL TIẾNG ANH igure 2:7.Unplug all connections on the engine wiring harness and remove.8.Using a 10 mm socket wrench, remove the bolt at the coolant inlet pipe brac

ket (A), and remove and remove the coolant inlet pipe and O-ring.9.Using a 10 mm socket wrench, remove two (2) bolts on the coolant outlet assembly (B ĐỘNG CƠ 2NR FE FULL TIẾNG ANH

), and remove the coolant outlet assembly and gasket.10.Using an adjustable wrench, remove the coolant temperature sensor unit (C).11.Using a 10 mm so

ĐỘNG CƠ 2NR FE FULL TIẾNG ANH

cket wrench, remove the four (4) bolts on the ignition coil packs, and remove the ignition coil packs.12.Using a 16 mm spark plug socket wrench, remov

Sequence IVBEngine Assembly Manual42790Section 1New Engine PreparationToyota Engine Assembly ManualNew Engine PreparationSheet 1IVB Draft42736New Engi

ĐỘNG CƠ 2NR FE FULL TIẾNG ANH emove the ten (10) bolts from the valve cover.14.Remove the valve cover and the valve cover gasket. If the gasket is stuck to the cylinder head, caref

ully use a plastic scraper to cut through the RTV sealant at the front cover to release the gasket. ĐỘNG CƠ 2NR FE FULL TIẾNG ANH

Sequence IVBEngine Assembly Manual42790Section 1New Engine PreparationToyota Engine Assembly ManualNew Engine PreparationSheet 1IVB Draft42736New Engi

Gọi ngay
Chat zalo
Facebook