KHO THƯ VIỆN 🔎

06 2 iok a1 THRUWAY

➤  Gửi thông báo lỗi    ⚠️ Báo cáo tài liệu vi phạm

Loại tài liệu:     WORD
Số trang:         64 Trang
Tài liệu:           ✅  ĐÃ ĐƯỢC PHÊ DUYỆT
 













Nội dung chi tiết: 06 2 iok a1 THRUWAY

06 2 iok a1 THRUWAY

CIVIL WORKS CONTRACT PACKAGE Al (KM 65+000-KM81 + 150)- DA NANG - QUANGNGAI SECTIONMETHOD STATEMENT FOR ROAD WORKSTABLE OF CONTENTSI.SITE CLEARING, GR

06 2 iok a1 THRUWAY RUBBING, EXCAVATION TOP SOILII.EXCAVATIONIII.ROCK BLASTINGIV.EMBANKMENTV.CONSTRUCTION SUB - BASE AND BASE COURSEVI.CONSTRUCTION ASPHALT CONCRETE PAVEM

ENT, ASPHALT TREATED BASE COURSEVII.CEMENT TREATED BASE COURSEVIII.PORTLAND CEMENT CONCRETE PAVEMENTIX.BITUMINOUS SURFACE TREATMENTPHUONG THANH TRANCO 06 2 iok a1 THRUWAY

NSIN -GRBCC JVI'MCIVIL WORKS CONTRACT PACKAGE Al (KM 65+000-KM81 + 150)- DA NANG - QUANGNGAI SECTIONCHAPTER I: METHOD STATEMENT FOR ROADI.Site Clearin

06 2 iok a1 THRUWAY

g, grubbing, excavation top soil1Site clearing, grubbing, excavation top soilSite clearance and grubbing: This work shall include the removal from gro

CIVIL WORKS CONTRACT PACKAGE Al (KM 65+000-KM81 + 150)- DA NANG - QUANGNGAI SECTIONMETHOD STATEMENT FOR ROAD WORKSTABLE OF CONTENTSI.SITE CLEARING, GR

06 2 iok a1 THRUWAY the like together with the removal and disposal off the site, of all materials and waste arising therefore, all as indicated on the drawings or as in

structed by the Engineer and as specified.The waste material and disposal and unsuitable materials shall be disposed by dump trucks to dispose site.Th 06 2 iok a1 THRUWAY

e suitable material to be reused under Engineer's instruction shall be stored and protected separately by Bidder.The quantity of clearing and grubbing

06 2 iok a1 THRUWAY

for payment shall be the actual completed area approved by the Engineer upon completion.The construction sequence is as follows:+step 1: Site is clea

CIVIL WORKS CONTRACT PACKAGE Al (KM 65+000-KM81 + 150)- DA NANG - QUANGNGAI SECTIONMETHOD STATEMENT FOR ROAD WORKSTABLE OF CONTENTSI.SITE CLEARING, GR

06 2 iok a1 THRUWAY umps and leveled by bulldozer+ step 4: The waste and unsuitable materials shall be loaded on the dump truck and then transported to the disposal site.

2.Demolition and removing existing structuresDemolition and Removal of Existing Structures consist of the removal, wholly or in part, and satisfactory 06 2 iok a1 THRUWAY

disposal of blocks of masonry of an individual size greater than 1 cubic meter, of all buildings, hedges, fences, structures, pavements regardless of

06 2 iok a1 THRUWAY

its nature (asphalt, concrete, etc.), curbs, and any other obstructions which are not designated or permitted to remain. Demolition includes the salv

CIVIL WORKS CONTRACT PACKAGE Al (KM 65+000-KM81 + 150)- DA NANG - QUANGNGAI SECTIONMETHOD STATEMENT FOR ROAD WORKSTABLE OF CONTENTSI.SITE CLEARING, GR

06 2 iok a1 THRUWAY from demolition and removal work.Right of way acquisition may not be completed in all areas at the start-up of the construction period and the Bidder

shall schedule the work associated with Specification.PHUONG THANH TRANCONSIN -GRBCC JV 06 2 iok a1 THRUWAY

CIVIL WORKS CONTRACT PACKAGE Al (KM 65+000-KM81 + 150)- DA NANG - QUANGNGAI SECTIONMETHOD STATEMENT FOR ROAD WORKSTABLE OF CONTENTSI.SITE CLEARING, GR

Gọi ngay
Chat zalo
Facebook