KHO THƯ VIỆN 🔎

appendix-8-champlain-parkway-june-2020-ls-dseis

➤  Gửi thông báo lỗi    ⚠️ Báo cáo tài liệu vi phạm

Loại tài liệu:     PDF
Số trang:         60 Trang
Tài liệu:           ✅  ĐÃ ĐƯỢC PHÊ DUYỆT
 













Nội dung chi tiết: appendix-8-champlain-parkway-june-2020-ls-dseis

appendix-8-champlain-parkway-june-2020-ls-dseis

APPENDIX 8: 2019 CHAMPLAIN PARKWAY NEPA REEVALUATION^.VERMONTstate of VermontAgency of TransportationEnvironmental SectionOne National Life DriveMontp

appendix-8-champlain-parkway-june-2020-ls-dseispelier, VT 05633Matthew Hake, Division Administrator43587Federal Highway Administration87 State Street, Montpelier, Vermont 05602Attn: Kenneth R. Siko

ra, Environmental Program ManagerRe:Burlington MEGC M5000 (1), Southern Conncctor/Champlain ParkwayFSEIS ReevaluationDear Mr. Hake:The Burlington MEGC appendix-8-champlain-parkway-june-2020-ls-dseis

M5000 (1), Southern Connector/Champlain Parkway project, is located in the city or Burlington, Vermont. The project is a proposed transportation link

appendix-8-champlain-parkway-june-2020-ls-dseis

located in the southwestern quadrant of the City of Burlington, Chittenden County, Vermont providing access between Interstate 189, U.S. Route 7 (She

APPENDIX 8: 2019 CHAMPLAIN PARKWAY NEPA REEVALUATION^.VERMONTstate of VermontAgency of TransportationEnvironmental SectionOne National Life DriveMontp

appendix-8-champlain-parkway-june-2020-ls-dseisnmental Impact Statement (FSEIS). The FSEIS included a Section 106 determination of No Adverse Effect and a de minimis use of Section 4(0 resources. S

ince the completion of the FSEIS and the issuance of the ROD, there have been some minor revisions to the project. A Section 106 Amendment/ No Adverse appendix-8-champlain-parkway-june-2020-ls-dseis

Effect was issued on April 6,2017 and an additional Section 4(0 De Minimis Determination was issued on May 5,2017. The project is scheduled to be adv

appendix-8-champlain-parkway-june-2020-ls-dseis

ertised for bids in 2019.In accordance with 23 CFR 771.129(c) a rc-cvaluation of the FSEIS has been prepared for the project prior to FHWA's authoriza

APPENDIX 8: 2019 CHAMPLAIN PARKWAY NEPA REEVALUATION^.VERMONTstate of VermontAgency of TransportationEnvironmental SectionOne National Life DriveMontp

appendix-8-champlain-parkway-june-2020-ls-dseis subsequent to the 2009 FSEIS. A section by section summary of the changes are as follows:Section C/2•The Grocery Spur tracks will be removed to elimi

nate the at-grade crossing.Section C/6•The addition of a shared-use path along the western side of Pine Street between Lakeside Avenue and Kilburn Str appendix-8-champlain-parkway-june-2020-ls-dseis

eet.•Traffic calming features on Pine Street including curb bump-outs and pedestrian actuated rectangular rapid flashing beacons at mid-block crosswal

appendix-8-champlain-parkway-june-2020-ls-dseis

ks will be added.•On-street bike lanes between Lakeside Avenue and I-ocust Street, and Kilburn Street and Maple Street will be added.- Between Lakesid

APPENDIX 8: 2019 CHAMPLAIN PARKWAY NEPA REEVALUATION^.VERMONTstate of VermontAgency of TransportationEnvironmental SectionOne National Life DriveMontp

appendix-8-champlain-parkway-june-2020-ls-dseisfive-foot bike lane in thenorthbound direction.-Between Locust Street and Kilburn Street, and between Maple Street and Main Street, the design will fe

ature a two-foot shoulder and 11-foot shared lane in the southbound direction while the northbound direction will consist of an 11-foot shared lane, a appendix-8-champlain-parkway-june-2020-ls-dseis

four-foot painted parking lane butler and a seven-foot parking lane.-Between Kilburn Street and Maple Street, the design consists of an 11-foot trave

appendix-8-champlain-parkway-june-2020-ls-dseis

l lane, 1.5-foot bike lane buffer and 5-foot bike lane in both directions.•The Pine Street Rail Spur will be partially removed.•The proposed shared-us

APPENDIX 8: 2019 CHAMPLAIN PARKWAY NEPA REEVALUATION^.VERMONTstate of VermontAgency of TransportationEnvironmental SectionOne National Life DriveMontp

appendix-8-champlain-parkway-june-2020-ls-dseis Chy of Burlington received VTrans’ approval in 2017 to underground overhead utilities on Lakeside Avenue.In addition, a summary of the changes in the

affected environment within the project study area arc as follows:•The location of new wetlands (P and Q) along with delineations and renewed permitt appendix-8-champlain-parkway-june-2020-ls-dseis

ing.•Impacts to a Special Flood Hazard Area as a result of 2011 revisions in the FEM A Flood Insurance Rate Maps.•The Northern Long-eared Bat was iden

appendix-8-champlain-parkway-june-2020-ls-dseis

tified as existing in the geographic area of the project.•A 2015/2016 evaluation of developmental soils per new Agency of Natural Resources regulation

APPENDIX 8: 2019 CHAMPLAIN PARKWAY NEPA REEVALUATION^.VERMONTstate of VermontAgency of TransportationEnvironmental SectionOne National Life DriveMontp

appendix-8-champlain-parkway-june-2020-ls-dseisate land use/ development traffic.

APPENDIX 8: 2019 CHAMPLAIN PARKWAY NEPA REEVALUATION^.VERMONTstate of VermontAgency of TransportationEnvironmental SectionOne National Life DriveMontp

Gọi ngay
Chat zalo
Facebook