Geology_Ever_Changing_Rocks_Level_4_CA
➤ Gửi thông báo lỗi ⚠️ Báo cáo tài liệu vi phạmNội dung chi tiết: Geology_Ever_Changing_Rocks_Level_4_CA
Geology_Ever_Changing_Rocks_Level_4_CA
TTUS FP&C Design & Building StandardsDivision 16 - ElectricalDivision 16 - ElectricalGeneralThis standard sets forth the minimum requirements for basi Geology_Ever_Changing_Rocks_Level_4_CAic electrical materialsand methods used in construction on University projects. It is not intended to be used as a complete specification or to preempt the professional judgment of the Design Professional.Engineering Services of the Texas Tech's Operations Division will be responsible for coordinati Geology_Ever_Changing_Rocks_Level_4_CAng the work between the Contractor and Lubbock Power & Light (LP&L). Contact TTU Operations at (806) 742-2761.The work shall be performed by a contracGeology_Ever_Changing_Rocks_Level_4_CA
tor with a current Texas license. This contractor shall be fully responsible to meet project requirements, including items exceeding those specificallTTUS FP&C Design & Building StandardsDivision 16 - ElectricalDivision 16 - ElectricalGeneralThis standard sets forth the minimum requirements for basi Geology_Ever_Changing_Rocks_Level_4_CAystem of the type specified for this project. References will be made available upon request.At a minimum, each Contractor and all materials/equipment suppliers shall guarantee all labor and materials furnished by respective entity for a period of one year unless otherwise noted. Warranty period sha Geology_Ever_Changing_Rocks_Level_4_CAll extend from the date of substantial completion or upon written directive from the Owner, whichever occurs first. The warranty shall cover the repaiGeology_Ever_Changing_Rocks_Level_4_CA
r or replacement, at the Contractor's expense, of any defective material or faulty workmanship.The utility company provides and installs all transformTTUS FP&C Design & Building StandardsDivision 16 - ElectricalDivision 16 - ElectricalGeneralThis standard sets forth the minimum requirements for basi Geology_Ever_Changing_Rocks_Level_4_CAg rack and raceway from the transformer to a remote location for the utility company to install the meter.All supports shall be from structural members of the facility. No conduit, wire, devices, etc., shall be supported from suspended ceiling or support cables of suspended ceilings.Contractor will Geology_Ever_Changing_Rocks_Level_4_CAtypically be responsible for providing all secondary cable, conduit, and other devices other than metering equipment. It shall be the responsibility oGeology_Ever_Changing_Rocks_Level_4_CA
f the Contractor to coordinate with the utility company for connection to the utility company's transformer and/or meter.All surfaces shall be restoreTTUS FP&C Design & Building StandardsDivision 16 - ElectricalDivision 16 - ElectricalGeneralThis standard sets forth the minimum requirements for basi Geology_Ever_Changing_Rocks_Level_4_CA accomplished to the satisfaction of the Architect/Engineer prior to energizing any circuit or new equipment.Revised 08-22-2016Pagel of 48TTUS FP&C Design & Building StandardsDivision 16 - ElectricalAll materials and equipment, where applicable, shall be listed by Underwriters Laboratories and FM Ap Geology_Ever_Changing_Rocks_Level_4_CAproved and the installation shall be in accordance with the manufacturer's recommendations and FM Global Recommended Good Practices.The manufacturer'sGeology_Ever_Changing_Rocks_Level_4_CA
published directions shall be followed in the delivery, storage, protection, installation, and wiring of all equipment and material. The Contractor sTTUS FP&C Design & Building StandardsDivision 16 - ElectricalDivision 16 - ElectricalGeneralThis standard sets forth the minimum requirements for basi Geology_Ever_Changing_Rocks_Level_4_CAections, and shall obtain the Architect/Engineer's instructions before proceeding with the work. Should the Contractor perform any such work that does not comply with the manufacturers' directions or such instructions from the Architect/Engineer, he shall bear all costs arising in connection with th Geology_Ever_Changing_Rocks_Level_4_CAe deficiencies.Contractor shall provide temporary construction power and lighting to/at the site for the use of all trades.Where conduit, raceway, cabGeology_Ever_Changing_Rocks_Level_4_CA
le trays, wiring, etc. pass through floors, walls, partitions or ceilings having a required smoke and/or fire resistive rating, such penetrations shalTTUS FP&C Design & Building StandardsDivision 16 - ElectricalDivision 16 - ElectricalGeneralThis standard sets forth the minimum requirements for basi Geology_Ever_Changing_Rocks_Level_4_CAs shall be caulked or otherwise sealed to achieve a smoke tight condition in a manner acceptable to the Architect/Engineer.At a minimum, provide access panels where required by codes and for maintenance or service.Clean lamps, reflectors and lenses of all lighting fixtures. Clean panelboards and equ Geology_Ever_Changing_Rocks_Level_4_CAipment cabinets inside and out. Apply touch-up paint of the specified color to any scratches or mars on the finish of all equipment, raceway, etc.ProvGeology_Ever_Changing_Rocks_Level_4_CA
ide a preliminary study and a complete short-circuit study and protective relay and device coordination study from the 1247kV utility service by LubboTTUS FP&C Design & Building StandardsDivision 16 - ElectricalDivision 16 - ElectricalGeneralThis standard sets forth the minimum requirements for basi Geology_Ever_Changing_Rocks_Level_4_CAfacturer of the electrical gear and shall include the generator skid mounted circuit breaker to the largest branch device on the volt emergency and standby panelboards. Provide arc-flash calculations and labels for each piece of electrical equipment modified or provided in this contract.Basic Electr Geology_Ever_Changing_Rocks_Level_4_CAical Materials and MethodsA conduit sleeve shall be two standard sizes larger than the size of conduit it serves, except where "Link Seal" casing sealGeology_Ever_Changing_Rocks_Level_4_CA
s are used in sleeves through walls below grade. All sleeves in floor shall extend a minimum of 2 inches above the finished floor. All conduit passingTTUS FP&C Design & Building StandardsDivision 16 - ElectricalDivision 16 - ElectricalGeneralThis standard sets forth the minimum requirements for basi Geology_Ever_Changing_Rocks_Level_4_CA 16-gauge galvanized steel except at conduit supports. Sleeves set in concrete floor construction Revised 08-22-2016Page 2 of 48TTUS FP&C Design & Building StandardsDivision 16 - Electricalsupporting conduit risers shall be standard weight galvanized steel. Sleeves supporting conduit risers 3 inches Geology_Ever_Changing_Rocks_Level_4_CA and larger shall have three 6 inches long reinforcing rods welded at 120 degree spacing to the sleeve and shall be installed embedded in the concreteGeology_Ever_Changing_Rocks_Level_4_CA
or grouped to existing concrete. Where the conduit passes through a sleeve, no point of the conduit shall touch the sleeve. Seal around penetrations TTUS FP&C Design & Building StandardsDivision 16 - ElectricalDivision 16 - ElectricalGeneralThis standard sets forth the minimum requirements for basi Geology_Ever_Changing_Rocks_Level_4_CArequired, power metering system at switchgear shall be PowerLogic that is compatible with existing PowerLogic software.Wire and CableWire, cable, and connectors shall be new and of manufacturer's standard materials, as indicated by published product information. Provide wire, cable, and connector of Geology_Ever_Changing_Rocks_Level_4_CA design and construction as required for the installation.Provide factory-fabricated wire of the size, rating, material and type as indicated for eachGeology_Ever_Changing_Rocks_Level_4_CA
service. Where not indicated, provide proper selection as required to comply with installation requirements and with NEC standards.Marking:TTUS FP&C Design & Building StandardsDivision 16 - ElectricalDivision 16 - ElectricalGeneralThis standard sets forth the minimum requirements for basiTTUS FP&C Design & Building StandardsDivision 16 - ElectricalDivision 16 - ElectricalGeneralThis standard sets forth the minimum requirements for basiGọi ngay
Chat zalo
Facebook