P3723 Greater Norwich Energy Infrastructure Study with Appendices

Greater Norwich EnergyInfrastructure studyReport DescriptionAuthor: Archie CorlissPrepared for: Greater Norwich Development Partnership and Growth Boa

P3723 Greater Norwich Energy Infrastructure Study with AppendicesardDate: 28 May 2019Reference: P3723eqnida

best professional endeavours of the authors. All calculations are based on the best information available Io US at the time of report production Wher P3723 Greater Norwich Energy Infrastructure Study with Appendices

e third party equipment is referred to we rely on manufacturer performance statements, guarantees and warranties. We are not liable for any errors in

P3723 Greater Norwich Energy Infrastructure Study with Appendices

calculations or omissions resulting from data provided by the customer or third parties.Egnida Consulting works to all relevant professional standards

Greater Norwich EnergyInfrastructure studyReport DescriptionAuthor: Archie CorlissPrepared for: Greater Norwich Development Partnership and Growth Boa

P3723 Greater Norwich Energy Infrastructure Study with Appendicesof £5 million.435561Contents1.Executive summary32.Introduction83.Existing energy demand93.1.Existing energy demands for electricity and heat93.2.Proje

cted future demands for electricity, heal and power103.2.1.Review OÍ energy demand for committed sites103.2.2.After Diversity Maximum Demand variation P3723 Greater Norwich Energy Infrastructure Study with Appendices

s153.2.3.Review of demand from additional development184.Electricity network constraints analysis204.1.Existing electricity network constraints214.1.1

P3723 Greater Norwich Energy Infrastructure Study with Appendices

.LI IV network constraints264.2.Planned network reinforcement274.2.1.Conventional reinforcement274.2.2.Alternatives to conventional reinforcement284.3

Greater Norwich EnergyInfrastructure studyReport DescriptionAuthor: Archie CorlissPrepared for: Greater Norwich Development Partnership and Growth Boa

P3723 Greater Norwich Energy Infrastructure Study with Appendicest and power345.1.1.Smart control and demand side management345.1.2.Innovative approaches to infrastructure investment36

Greater Norwich EnergyInfrastructure studyReport DescriptionAuthor: Archie CorlissPrepared for: Greater Norwich Development Partnership and Growth Boa