KHO THƯ VIỆN 🔎

Southbridge Star Pumper_proposal specs

➤  Gửi thông báo lỗi    ⚠️ Báo cáo tài liệu vi phạm

Loại tài liệu:     PDF
Số trang:         138 Trang
Tài liệu:           ✅  ĐÃ ĐƯỢC PHÊ DUYỆT
 













Nội dung chi tiết: Southbridge Star Pumper_proposal specs

Southbridge Star Pumper_proposal specs

SpartanBid Proposal SpecificationsINTENT OF SPECIFICATIONSSpartan ERV submits the following detailed proposal for your consideration:Unit will be desi

Southbridge Star Pumper_proposal specsigned and constructed to follow the requirements of the following:FMVSS; DOT; ICC; NFPA Pamphlet 1901; SAE; TRA; ULI; TBEA; and State Motor Vehicle re

gulations (1901 equipment not requested is not included).Unit will be protected by permanent Anti-Freeze for operation between -30 degrees F to +235 d Southbridge Star Pumper_proposal specs

egrees F and shall have all fluid levels filled prior to deliver}'.Unit will be manufactured at a Spartan ERV manufacturing facility. Spartan ERV oper

Southbridge Star Pumper_proposal specs

ates three (3) manufacturing facilities. An apparatus manufacturing facility located at 907 - 7th Avenue North. Brandon, South Dakota, an aerial manuf

SpartanBid Proposal SpecificationsINTENT OF SPECIFICATIONSSpartan ERV submits the following detailed proposal for your consideration:Unit will be desi

Southbridge Star Pumper_proposal specs, Florida.Unit will be quality control inspected and documented at each step of manufacturing, and will be fully road tested.To insure proper break-in

of all components while still under warranty, the apparatus shall be delivered under its own power. The unit will remain insured by until the departm Southbridge Star Pumper_proposal specs

ent accepts the unit.Unit will be designed and assembled so that all recommended daily maintenance checks can be performed easily by the operator with

Southbridge Star Pumper_proposal specs

out the need for hand tools. Apparatus components that interfere with removal or repair of other major components will be attached with fasteners and

SpartanBid Proposal SpecificationsINTENT OF SPECIFICATIONSSpartan ERV submits the following detailed proposal for your consideration:Unit will be desi

Southbridge Star Pumper_proposal specst the pump operator's position which gives the rated discharges and pressures, together with the speed of the engine as determined by the manufacturer

's lest for this unit.A manufacturer's certification of GVWR and GAWR on a nameplate will be affixed to the completed vehicle.A permanent plate mounte Southbridge Star Pumper_proposal specs

d in the driver's compartment will be supplied. It will specify the quantity and type of the following fluids used in the vehicle: engine oil, engine

Southbridge Star Pumper_proposal specs

coolant, chassis transmission fluid, pump transmission lubrication fluid, pump primer fluid (if used), and drive axle lubrication fluid.A permanent pl

SpartanBid Proposal SpecificationsINTENT OF SPECIFICATIONSSpartan ERV submits the following detailed proposal for your consideration:Unit will be desi

Southbridge Star Pumper_proposal specsf the included cab.Signs that state "OCCUPANTS MUST BE SEATED AND BELTED WHEN APPARATUS IS IN MOTION" will be provided. They will be visible from each

seated position.An accident prevention sign will be located at the rear step area of the apparatus. The sign will warn personnel that standing on the Southbridge Star Pumper_proposal specs

step while vehicle is in motion; is prohibited.A nameplate indicating the chassis transmission shift selector position to be used for pumping will be

Southbridge Star Pumper_proposal specs

provided in the driving compartment and located so that it can be easily read from the driver’s position.The height of the fully loaded vehicle's cen

SpartanBid Proposal SpecificationsINTENT OF SPECIFICATIONSSpartan ERV submits the following detailed proposal for your consideration:Unit will be desi

Southbridge Star Pumper_proposal specsin the limits set by the chassis manufacturer. The front axle loads will not be less than the maximum axle loads specified by the chassis manufacturer

, under full load and all other loading conditions.The difference in weight on the end of each axle, from side to side, when the vehicle is fully load Southbridge Star Pumper_proposal specs

ed and equipped will not exceed 7 percent.All manufacturers' operations and maintenance documents supplied with components and equipment installed on,

Southbridge Star Pumper_proposal specs

or supplied with the completed vehicle will be provided.Any special tools that are required to sendee any component will be provided with the complet

SpartanBid Proposal SpecificationsINTENT OF SPECIFICATIONSSpartan ERV submits the following detailed proposal for your consideration:Unit will be desi

Southbridge Star Pumper_proposal specs repair.The apparatus when fully loaded will be capable of the following performance on dry, level paved roads in good condition, item (d) not include

d.(a)From a standing start the vehicle will attain a true speed of 35 mph within 25 seconds.(b)From a steady pace of 15 mph, the vehicle will accelera Southbridge Star Pumper_proposal specs

te to a true speed of 35 mph within 15 seconds. This will be accomplished without moving gear selector.(c)The vehicle will attain a minimum speed of 6

Southbridge Star Pumper_proposal specs

0 mph.(d)The apparatus will be able to maintain a speed of at least 20 mph on any grade up to and including 6 percent.Southbridge Fire DepartmentPage

SpartanBid Proposal SpecificationsINTENT OF SPECIFICATIONSSpartan ERV submits the following detailed proposal for your consideration:Unit will be desi

SpartanBid Proposal SpecificationsINTENT OF SPECIFICATIONSSpartan ERV submits the following detailed proposal for your consideration:Unit will be desi

Gọi ngay
Chat zalo
Facebook