KHO THƯ VIỆN 🔎

Vlakfontein-Ecological-Report-06-July-2015

➤  Gửi thông báo lỗi    ⚠️ Báo cáo tài liệu vi phạm

Loại tài liệu:     WORD
Số trang:         53 Trang
Tài liệu:           ✅  ĐÃ ĐƯỢC PHÊ DUYỆT
 













Nội dung chi tiết: Vlakfontein-Ecological-Report-06-July-2015

Vlakfontein-Ecological-Report-06-July-2015

ECOLOGICAL ASSESSMENT REPORT FOR THE CONSTRUCTION OF THE RAND WATER ADDITIONAL 210ML AND FUTURE PLANNED 200ML RESERVOIR ON VLAKFONTEIN FARM 69IR, CRYS

Vlakfontein-Ecological-Report-06-July-2015STAL PARK. EKURHULENI METROPOLITAN MUNICIPALITYAUGUST 2015 vs 2TITLE:COMPILED BY:ECOLOGICAL ASSESSMENT REPORT FOR THE CONSTRUCTION OF THE RAND WATER A

DDITIONAL 210ML AND FUTURE PLANNED 200ML RESERVOIR ON VLAKFONTEIN FARM 69IR, CRYSTAL PARK, EKURHULENI METROPOLITAN MUNICIPALITYMZAMO ZUNGU AND LUFUNO Vlakfontein-Ecological-Report-06-July-2015

NEMAKHAVHANISTATUS OF REPORT:FINAL DRAFTDOCUMENT CONTROL IN000034/2015-SPFIRST ISSUE:SECOND ISSUE:4218142222REVIEWED AND APPROVED BY:Nonkanyiso Zungu,

Vlakfontein-Ecological-Report-06-July-2015

Pr.Nat.Sci (MSc, Env. Mngt)Wetland Specialist/EcologistDate: 06 August 2015IndemnityThis report is based on survey and assessment techniques which ar

ECOLOGICAL ASSESSMENT REPORT FOR THE CONSTRUCTION OF THE RAND WATER ADDITIONAL 210ML AND FUTURE PLANNED 200ML RESERVOIR ON VLAKFONTEIN FARM 69IR, CRYS

Vlakfontein-Ecological-Report-06-July-2015ns and recommendations given in this report are based on the author's best scientific and professional knowledge as well as information available at t

he time of study. Therefore the author reserves the right to modify aspects of the report, including the recommendations, if and when new information Vlakfontein-Ecological-Report-06-July-2015

may become available from ongoing research or further work in this field, or pertaining to this investigation.Although the author exercised due care a

Vlakfontein-Ecological-Report-06-July-2015

nd diligence in rendering services and preparing documents, she accepts no liability, and the client, by receiving this document, indemnifies the auth

ECOLOGICAL ASSESSMENT REPORT FOR THE CONSTRUCTION OF THE RAND WATER ADDITIONAL 210ML AND FUTURE PLANNED 200ML RESERVOIR ON VLAKFONTEIN FARM 69IR, CRYS

Vlakfontein-Ecological-Report-06-July-2015ly or indirectly by the author and by the use of this document.EXECUTIVE SUMMARYRand Water is proposing the construction and maintenance of the Rand W

ater H43 pipeline with an internal diameter of 1200mm, and its associated structure (valve chambers and cathodic protection) between Graham Street, ce Vlakfontein-Ecological-Report-06-July-2015

nturion and Lyttelton within the Gauteng Province. The proposed pipeline is located in City of Tshwane and City' of Johannesburg in the Gauteng Provin

Vlakfontein-Ecological-Report-06-July-2015

ce. The extent of the pipeline is approximately 17,5km situated on Doornkloof JR391 portion 41, 116, 149. 157, 161, 193, 163, 322, 324, 232, Brakfonte

ECOLOGICAL ASSESSMENT REPORT FOR THE CONSTRUCTION OF THE RAND WATER ADDITIONAL 210ML AND FUTURE PLANNED 200ML RESERVOIR ON VLAKFONTEIN FARM 69IR, CRYS

Vlakfontein-Ecological-Report-06-July-2015ane and City of Johannesburg Urban spatial Development Frameworks.Ecological assessments provide information to support a variety of decision making a

nd project planning processes on project feasibility and a final site layout. Methods of data collection and analysis included a GIS desktop exercise, Vlakfontein-Ecological-Report-06-July-2015

a review of aerial imagery, a site visit and sampling exercise, as well as the use of published data. The results were then used to rate die sensitiv

Vlakfontein-Ecological-Report-06-July-2015

ity within the study area, to compile a species list and classify vegetation communities. These attributes were then rated on their level of sensitivi

ECOLOGICAL ASSESSMENT REPORT FOR THE CONSTRUCTION OF THE RAND WATER ADDITIONAL 210ML AND FUTURE PLANNED 200ML RESERVOIR ON VLAKFONTEIN FARM 69IR, CRYS

Vlakfontein-Ecological-Report-06-July-2015e Dolomite Grassland and Egoli Granite Grassland. From the ecological data collected, a sensitivity map was compiled as a precursor to this report. Se

ctions of the site were rated as low, medium or high sensitivity based on the level of disturbance, ecological condition and species composition.Resul Vlakfontein-Ecological-Report-06-July-2015

ts of the study indicate that the species composition of the vegetation of approximate less than 5% of the species suggested by Mucina and Rutherford

Vlakfontein-Ecological-Report-06-July-2015

(2006). However, species diversity was low on the sites close to the in the zones around the portion mainly due to developments and agriculture. Most

ECOLOGICAL ASSESSMENT REPORT FOR THE CONSTRUCTION OF THE RAND WATER ADDITIONAL 210ML AND FUTURE PLANNED 200ML RESERVOIR ON VLAKFONTEIN FARM 69IR, CRYS

Vlakfontein-Ecological-Report-06-July-2015ARY......................................................i1INTRODUCTION........................................................51.1TERMS OF REFERENCE.

.............................................81.2LIMITATIONS.....................................................82BACKGROUND INFORMATION............. Vlakfontein-Ecological-Report-06-July-2015

................................102.1LOCATION.......................................................10

ECOLOGICAL ASSESSMENT REPORT FOR THE CONSTRUCTION OF THE RAND WATER ADDITIONAL 210ML AND FUTURE PLANNED 200ML RESERVOIR ON VLAKFONTEIN FARM 69IR, CRYS

ECOLOGICAL ASSESSMENT REPORT FOR THE CONSTRUCTION OF THE RAND WATER ADDITIONAL 210ML AND FUTURE PLANNED 200ML RESERVOIR ON VLAKFONTEIN FARM 69IR, CRYS

Gọi ngay
Chat zalo
Facebook